Skip to content

IT Infrastructure

Structured cabling remediation at Terminal 1

Cable tracing, rerouting, testing, labeling and optimization of over 600 network connections in a live, critical aviation environment.

Client

HTS — Abu Dhabi Airport Terminal 1

Year

2025

Scope

Structured Cabling, Networking, Optimization

600+

connections optimized

The engagement

Cable tracing, rerouting, testing, labeling and optimization of over 600 network connections in a live, critical aviation environment.

KnowBit delivered this as a strategic partner — owning the outcome end to end, from assessment and architecture through deployment and ongoing optimization.

Let's build something that lasts.

Start a conversation with a partner who owns the outcome, not just the ticket.